Time Waste Reduction in LEONI Harnesses Company
dc.Affiliation | October University for modern sciences and Arts (MSA) | |
dc.contributor.author | Abu-Bakr Mohamed, Wael | |
dc.contributor.author | Mohamed Emam, Omar | |
dc.date.accessioned | 2021-07-26T10:03:45Z | |
dc.date.available | 2021-07-26T10:03:45Z | |
dc.date.issued | 2021 | |
dc.description | Faculty Of Engineering Graduation Project 2020- 2021 | en_US |
dc.description.abstract | Waste reduction is the most important aspect in the lean production so that the manufacturing companies adopt this tool to improve the productivity in its production lines and improve customer satisfaction. The project’s aim and objective are concerned with improving the productivity in harness production factory by reducing time waste. The factory is facing a problem in time balancing; the operations are not done in equal timing which causes time waste problems in utilization and production rate. This project focuses on analyzing different production line stages as defining exactly the main reasons of time waste. A suitable methodology will be applied such as Simo-chart, Ergonomics, and time analysis for the production line to achieve the balance that will help to reduce the time waste and increase the production rate | en_US |
dc.description.sponsorship | Prof. Dr. Nahed Sobhi Dr. Sameh Ahmed | en_US |
dc.identifier.citation | Copyright © 2021 MSA University. All Rights Reserved. | en_US |
dc.identifier.uri | http://repository.msa.edu.eg/xmlui/handle/123456789/4628 | |
dc.language.iso | en | en_US |
dc.publisher | MSA university Faculty Of Engineering | en_US |
dc.relation.ispartofseries | Faculty Of Mass Communication Graduation Project 2020 - 2021; | |
dc.subject | October university for modern sciences and arts | en_US |
dc.subject | جامعة أكتوبر للعلوم الحديثة والآداب | en_US |
dc.subject | MSA University | en_US |
dc.subject | University of Modern Sciences and Arts | en_US |
dc.subject | Production system | en_US |
dc.subject | Time analysis | en_US |
dc.subject | Simo-Chart Utilization | en_US |
dc.subject | Ergonomics, Time waste reduction | en_US |
dc.title | Time Waste Reduction in LEONI Harnesses Company | en_US |
dc.type | Other | en_US |