Time Waste Management in Polyethylene Terephthalate (PET) Plastic Preform Production

dc.AffiliationOctober University for modern sciences and Arts (MSA)  
dc.contributor.authorGamal Mohamed " 137543 ", Youssef
dc.contributor.authorReda Ahmed " 145479 ", Ahmed
dc.contributor.authorAhmed " supervisor ", Dr. Sameh
dc.contributor.authorSobhy, Prof. Dr. Nahed " supervisor "
dc.date.accessioned2021-04-22T21:25:40Z
dc.date.available2021-04-22T21:25:40Z
dc.date.issued2021
dc.descriptionFaculty of Engineering Department of Industrial Systems Engineeringen_US
dc.description.abstractIn Medcoplast Co. factory in Egypt founded in the late 1960s that started by only producing simple plastic droppers, nowadays Medcoplast Co. have twelve identical all electrical hot-runner plastic injection molding machines for production of plastic preforms and packaging products with 25% of market share in Egypt and even market shares in northern African countries such as Algeria. The main production in facility is PET-Plastic Preforms. A high exchange & refurbishment time of molds (718 min) occur leading to a lower capacity of production, direct time & money losses, while Single Minute Exchange of Die (SMED) is considered a major lean manufacturing tool & one of the most used techniques to tackle mold exchange operation management & time reduction of them. In this project, Implementation of the basic steps of SMED technique separation of activities led exchange to be reduced by 34% (244 min reduction) including recommendations made regarding operators, inspection approach and material handling. In addition, aiming for standardization and visualization of operation, a quarterly update-able Stream Map has been developed presenting Mold exchange activities flow, assigned operator and cycle times, to facilitate operation on both supervision and operators as a present supporting tool and as guide for future operation improvements, estimating to accumulate at least an extra 7% to the reduction. Any reduction of mold exchange cycle time would directly translate into money & products saved ( ≈ 90,000 - 110,000 preforms for each hour ) as a result of exchange time reduction.en_US
dc.description.sponsorshipMSA Universityen_US
dc.identifier.citationCopyright © 2021 MSA University. All Rights Reserved.en_US
dc.identifier.urihttp://repository.msa.edu.eg/xmlui/handle/123456789/4541
dc.language.isoenen_US
dc.publisherMSA university Faculty of Engineeringen_US
dc.subjectOctober University of Modern Sciences and Artsen_US
dc.subjectجامعة أكتوبر للعلوم الحديثة والآدابen_US
dc.subjectMSA Universityen_US
dc.subjectDSpace Egypten_US
dc.subjectFaculty of engineeringen_US
dc.subjectSMEDen_US
dc.subjectExchange timeen_US
dc.subjectPreformsen_US
dc.subjectPlastic injection molding industryen_US
dc.subjectTime wastesen_US
dc.titleTime Waste Management in Polyethylene Terephthalate (PET) Plastic Preform Productionen_US
dc.typeOtheren_US

Files