Improving Efficiency and Reducing Waste in Wood Factory
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
MSA University
Series Info
Doi
Scientific Journal Rankings
Orcid
Abstract
The Egyptian Company for Metal & Wood Industries facility specializes in producing
high end outdoor furniture. The Factory is situated in Egypt's 6th of October City's
industrial district. The factory was founded in 1986 and has since introduced a new
brand ACAJIA which is focused on producing outdoor and indoor furniture.
After investigating the outdoor furniture production line, two main problems were
observed. The first identified issue is material waste in the spindle molder machine,
which contributes to a loss ranging between 1.23% and 2.17% of the total output
across all wood cutting machines. The second issue is time waste during the manual
assembly process, particularly in the Preparation of Parts stage, which takes
approximately 2 hours, with a significant portion of this time being considered nonvalue-
adding.
The project aims to enhance productivity by reducing material waste by approximately
0.19 % to 0.20 % through the implementation of jigs and fixtures technique.
Additionally, it seeks to minimize time waste in the Preparation of Parts stage by
around 1.7 hours through the workplace redesign technique.
The implementation of the jigs and fixtures technique to address material waste in the
spindle molder machine resulted in a significant improvement, saving one full working
day per month. The total estimated savings from material reduction ranged between
1,885.6 L.E and 3,285.6 L.E per month. On the other hand, applying the Workplace
Redesign technique to improve the Preparation of Parts stage led to a time saving of
7.4 hours per month, with an associated cost saving of approximately 231 L.E.
Description
Faculty Of Engineering Graduation Project 2024- 2025
Citation
Industrial Systems Engineering
