Reducing Cycle Time in Nivea Deodorant Production Line
Loading...
Date
2024
Journal Title
Journal ISSN
Volume Title
Type
Other
Publisher
October university for modern sciences and arts
Series Info
Industrial Systems Engineering;
Doi
Scientific Journal Rankings
Abstract
Scitra Contract Production factory has been specializing in personal and home care in
UAE since 1976. Since 2016, the Egyptian branch has been located in the industrial zone
in 6th October City. Furthermore, the plant has swiftly gained a reputation as one of the
finest quality producers, which assists other companies in raising their productivity.
Scitra specializes in personal care and home care products from firms such as Nivea,
Rexona, Tide, Dove and Vanish.
After investigating the whole production process of Nivea Deodorant product, it was
found out that the washing process of the mixers used to take four and a half hours to be
washed, rinsed and sterilized. Furthermore, the pre-weighing process takes around two
hours to prepare and weigh all the needed materials to be mixed.
Additionally, the changeover time is a considerable delay resulting in a full stoppage for
the whole production line for five hours long to change from a size to another. Finally,
there is a frequent stoppage occurred in Nivea Deodorant production line because of lack
of knowledge of the workers in operating the Cap Screwing machine.
The project aims to reduce the time waste of the aforementioned problems which will
reduce the cycle time of Nivea Deodorant production process, and the results obtained
demonstrated a 15% reduction in cycle time. This is achieved by using industrial
engineering techniques such as Operation Analysis, DMAIC, 5S, Value Stream Mapping
(VSM), Correlation and Regression Analysis, and Single Minute Exchange of Dies
(SMED).
Description
Faculty of Engineering
Keywords
October University For Modern Sciences and Arts, MSA, October University For Modern Sciences and Arts MSA, جامعة اكتوبر للعلوم الحديثة والاداب, Continuous Improvement,, DMAIC,, VSM,, Correlation and Regression, Analysis, SMED,, 5S and Waste Time Reduction
Citation
Faculty Of Engineering Graduation Project 2023 - 2024